Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jan 21, 2018 07:48:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jan 21, 2018 07:48:31 IST

Blog Entry# 2151388
Posted: Feb 04 2017 (15:08)

12 Responses
Last Response: Jan 11 2018 (22:42)
  
Poll
1 Followers
4790 views
32 votes
Feb 04 2017 (15:08)   DDL/Dhandari Kalan (3 PFs)

I am a Visitor Admin Member on IRI*^~   9035 blog posts   1 correct pred (33% accurate)
Entry# 2151388            Tags   Past Edits
According to you what will be the time of launching for the Dedicated Eastern Freight Corridor (EDFC) which is a Flagship Project for the Narendra Modi Government just like WDFC or ADI-BCT Route Bullet Train Corridor ?
On time (Oct. 2019)6%2
Before time (March. 2019)9%3
Will skip the set deadline (probably before the 2019 Indian General Elections)84%27
Add your comment through blog0%0

7 posts - Sun Feb 05, 2017

  
3147 views
Feb 05 2017 (07:42)
मदन मोहन मीणा^~   10029 blog posts   392 correct pred (77% accurate)
Re# 2151388-8            Tags   Past Edits
DFC me alag parellel double track bichhaya jaega .jisme sirf Freight trains pass hongi .
Small stations par inme koi bhi connectig point nahi hoga. Only major stations par hi ye interconnected rahengi.
Jin villages stations ke pas track ke jagah nahi waha inhi tracks ko bypass ke jaisa nikala ja rha taki jyada destruction na ho. Overbridge and underpass itne banaye jayenge taki fatal nahi banana pade.

  
3352 views
Feb 05 2017 (12:51)
I am a Visitor Admin Member on IRI*^~   9035 blog posts   1 correct pred (33% accurate)
Re# 2151388-9            Tags   Past Edits
Yes, I remember. The then RM Mr. Lalu had announced about the DFC concept in the 2006 IR Budget. It was supposed to be ready for freight train operations by 2008. But this flagship project of IR went into cost overruns due to immense delays as work went on a snail's place. Just around 1+ Kms of track work was completed between Dehri-On-Sone and Durgauti (Durgawati). Let's see when the constructed tracks between Dehri-On-Sone and Kanpur get operational. Successful trials of a WAG-9 hauled freight train have taken place some months back between Dehri and Sasaram I suppose (DFC FB Page also has its pic)... :)

  
Feb 05 2017 (13:11)
I am a Visitor Admin Member on IRI*^~   9035 blog posts   1 correct pred (33% accurate)
Re# 2151388-10            Tags   Past Edits
You are right. There are some things that I've gone through on IRI through members' blog posts, news items, etc. regarding EDFC as follows:-
.
1) IR is trying to work on straightening of platforms at stations like Mirzapur along with the tracks (both loop and escape lines) to remove PSR. Track renewal work at GMO was also heard about to finish PSR of 30 Kmph & upgrade trains' MPS to 130 Kmph (For AC) and 110 Kmph (For Non-AC).
.
...
more...

2) IR wants to make the entire Howrah - Gaya - Mirzapur - Kanpur - Delhi Route 100% free of manned/unmanned level crossing gates and work seems to have been started in the 1st phase between Mughalsarai and Ghaziabad through ROB/FOB constructions to remove TSR. FOB construction work at GMO is also pending to finish PSR of 30 Kmph & upgrade trains' MPS to 130 Kmph (For AC) and 110 Kmph (For Non-AC).
.
3) IR plans to replace Manual Signalling with Automatic Block Signalling System (ABSS) between Allahabad and Kanpur for better train movement.
.
4) All the above points are meant to synchronize present HWH-GAYA-MZP-NDLS Old Tracks with parallel EDFC Modern tracks between Dankuni Jn and Khurja Jn. Abhishek Jaiswal Sir on IRI told me that signalling work on ALD-CNB stretch is left while its tracks won't be shared with platforms of stations like Hathras Jn, Tundla Jn, Aligarh Jn, Khurja Jn, etc. en route. So freight and passenger trains may use EDFC tracks if they have a Non-Stop MGS-ALD or ALD-CNB Run :)

  
298 views
Jan 10 2018 (14:21)
nankit0507~   1064 blog posts   42 correct pred (54% accurate)
Re# 2151388-11            Tags   Past Edits
after 2019

  
205 views
Jan 11 2018 (22:42)
a2z~   2343 blog posts
Re# 2151388-12            Tags   Past Edits
* DFC is a very old concept world wide, many DFCs were operational in many countries. Due to the industrial boom, IR was getting bumper incremental loading, IR decided to go for construction of DFCs in 2006 to meet the future loadings.
* Minimum of 4-5 yrs are required for construction of a corridor, announcing DFC in 2006 and planning to operate trains in 2 yrs is impractical. Practically the announcement mostly remained on papers and actual work was very slow.
* During the tenure of Mr Prabhu, contract awarding & construction
...
more...
work picked up speed.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jan 31
Trains with ARP 15 Dep on: Mon Feb 5
Trains with ARP 30 Dep on: Tue Feb 20
Trains with ARP 120 Dep on: Mon May 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.